Water softener 3
Our product range is known for its quality, and finds widespread application in various sectors such as chemical & biological laboratories, operation theater machines, aquariums, households, industries and etc. In accordance with the requirements of clients, we can provide distilled water (Cold Process Technology) in safe packaging of various quantities.
We manufacture and export a new and innovative range of products as per market demands, we provide tailor-made products as per Standards / requirements.
Application
Different grades and types of distilled water offered by us is formulated employing highly advanced cold process technology.
Commercial Distilled Water:
-
Distilled Water 3 in 1 ( Distilled Water 3 In 1 can be used in:::-
For top up in inverter and all types of batteries
Add with coolant in radiator (as per ratio recommended)
Add in wiper tank of a car for cleaning windshield
- Aquarium Water
- Battery Distilled Water
- Windshield Wiper Water
- Distilled Water For Home
- Industrial Water
- Distilled water for Pathology Laboratory
- Radiator Coolant Water
- SPA & Saloon Distilled Water
Procedure
Our product range includes Distilled Water, Battery Distilled Water, Windshield Wiper Fluid, Distilled Water For Home, Industrial Water, SPA & Saloon Distilled Water, Radiator Coolant Water, Laboratory Water, Medicated Water, Aquarium Water and Saloon Distilled Water.
Technical specifications
The products that we manufacture and supply are as per the following standards:
- Indian Standard (IS) 1069, 1070, 7029
- International Standards Organisation (ISO) 3696 grade 1, 2, 3
- American Standards- A.S.T.M D-1193 grade & types 1,2,3,4
Precautions
Distilled Water, Battery Distilled Water, Windshield Wiper Fluid, Distilled Water For Home, Industrial Water, SPA & Saloon Distilled Water, Radiator Coolant Water, Laboratory Water, Medicated Water, Aquarium Water and Saloon Distilled Water.
Useful areas
#DistilledWater_NaviMumbai
#DistilledWater_Dubai
#DistilledWater_Muscat
#DistilledWater_Nairobi
#Batterywater_Manufacturer
#Batterywater_Supplier
Industries
MAINTENANCE SCHEDULE ::: The maintenance schedule given here is divided in daily, weekly, monthly and yearly maintenance. The actions to be taken, checks and recording required are given herewith.
A.DAILY MAINTENANCE
1. A daily general maintenance should include a check and record of the following :
2. Overall float voltage measured at the battery terminals
3.Charger output current and voltage
4.Specific gravity, voltage and temperature of pilot cells.
B.WEEKLY MAINTENANCE
A weekly maintenance should include all the items mentioned in "daily maintenance" and the following :
1. Check electrolyte level of all cells and if required, top-up with battery grade water conforming to IS 1069. Never use metal vessels for topping up because of the risk of electrolyte continuation and accidental short circuit.
2. Visually check the conditions of each cell and battery bank. If abnormal or very high amount of sulphation on the terminals or connectors are observed, take immediate action in removing them.
3.Visually check the cleanliness of battery, battery stands and battery room area for accessibility, cell integrity and acid leakage.
C.MONTHLY MAINTENANCE
1. A monthly maintenance shall include all checks listed under "daily" and "weekly" maintenance schedule and also the following:
2.Check and record specific gravity, voltage and temperature of all cells in the battery bank.
3.Adjustment of specific gravity by addition of battery grade water is to be done only after charging and under skilled supervision (Never use acid for this purpose unless specifically suggested by manufacturer). After adjustment of specific gravity, charge the battery at a voltage around 2.4 volts per cell for a period of 2 hours for mixing of the electrolyte properly.
D.QUARTERLY MAINTENANCE
A quarterly maintenance shall include all checks listed under "daily","weekly" and "monthly" maintenance schedule and also the following :
1. Check and record specific gravity, voltage and temperature of all cells in the battery bank.
2.If the specific gravity of most of the cells are found to be lagging by an average of 10 to 15 points, the battery bank would call for an equalizing charge at a current equivalent to 3% - 5% of its rated value for 6-10 hours to restore the state of charge to full..
3.The temperature of the electrolyte normally is higher than the ambient. But for a bank, unless it has undergone a discharge within previous 24 hours, the electrolyte temperature should lie within 3
5 deg. C higher than the corresponding ambient temperature. In case of a deviation from this range, the charger needs to be checked for its quality of power output in terms of the ripple contents in the charging voltage and current. Corrective action should be immediately taken to avoid any deterioration in the battery bank due to this anomaly
E.HALF YEARLY MAINTENANCE
A half yearly maintenance shall include all checks listed under "daily", "weekly", "monthly" and "quarterly"
maintenance schedule and also the following :
1.Remove all corrosion product and clean connector thoroughly. Use enough amount of petroleum jelly on the connectors to prevent farther corrosion and put back shrouds in place.
2. Check the tightness of fasteners on inter-cell, inter-row and inter-tier connections to prescribed torque values as suggested by manufacturer. If required, tighten the connections to the required torque value .
F.YEARLY MAINTENANCE
A yearly maintenance should include all items listed under "daily", "weekly" and "monthly" maintenance schedule and also the following : Discharge the battery at C10 current for 10 hours followed by a constant current recharge.
The charging to start at the "starting rate" as mentioned in the product catalogue for the respective size till the cell voltage
reached 2.36 volts per cell followed by charging at "finishing rate" pertaining to the specific size of the battery as mentioned in manufacturer's catalogue. The charging to be stopped when the cell voltage and specific gravity readings are constant for four consecutive half hourly readings. The expected end-of-charge voltage is of the order of 2.7 2.75 volts per cell.
During charging it has to be ensured that a minimum Ah input of 125% of the previous discharged Ah is administered to the battery.
The temperature during charging should not increase beyond 450 C. In such cases, the charging to be stopped and the cells to be allowed to cool down till 400 C when the charging can be resumed. The timings are to be noted so that the duration of charge can be compensated accordingly to ensure that the minimum Ah input requirement is fulfilled. After the charging is over, gravity and level adjustments are to be carried out after a rest of 4 hour.
The battery bank, then, is to be given an equalisation charge at a current equivalent to 3% - 5% of rated C10 capacity for 12-24 hrs. The battery bank can be given back to the system after the equalising charge is over
.
Notes
b)GASES : Batteries can give off explosive gases. Keep sparks, flames and lighted cigarettes away from battery and battery room. Ensure connections are tight before switching on, using only insulated tools. Areas where batteries are kept or charged must be adequately ventilated.
c).ELECTRICITY : Use only insulated tools to make connections to a battery. Check the circuit to ensure it is safe before making a connection to the battery. Before working on a battery , always remove personal metal effects, such as rings, watches, bracelets, necklaces, etc. ALWAYS PROTECT THE EYES.
e)ERECTION :
Erection and commissioning of batteries to be done in accordance with separate instructions provided by manufacturer. FLOATING BATTERY SYSTEMS : In a floating battery installation the charger , battery and load are connected in parallel. The charger supplies the load current continuously whilst the battery remains in a charged condition, immediately capable of supplying the load should the main supply be interrupted.
CONDENSED INSTRUCTIONS Top up all cells regularly with distilled or deionised water. Keep the electrolyte level between the red and green mark, preferably near the green mark, etched on the transparent level indicator . If,before topping-up, the electrolyte level had fallen below the red mark, it is advisable to give the battery acharge for approximately ½ hour above 2.3 volts per cell after addition of battery grade distilled water in order to mix the electrolyte. Keep battery and surroundings clean and dry . Ensure bolted connections are tight. Keep connectors, pillars and bolted connections covered with petroleum jelly for protection against corrosion. Take every precaution to avoid risk of explosion of gases particularly during charge. Never smoke or use a naked flame near the battery, or in the battery room or take any action which could cause an electric spark. Ensure that charging equipment maintains the battery at the correct voltage. Examine all cells at regular intervals. Action should be taken to restore any "out of step" cells to a fully charged condition. The room in which the battery is housed should be well ventilated and its temperature as moderate as the climate will allow . The temperature of electrolyte should preferably never exceed 380C FLOATING The method of operation known as "floating" means that the charger, the battery and the load are connected in parallel. The battery should be held constant at a voltage between 2.23 to 2.27 volts per cell, so that the battery will normally be maintained in a fully charged condition. The voltage to be maintained based on the ambient temperature as detailed in TableI.
| Temperature | Float Voltage |
Supply locationsDistilled Water Battery grade manufacturer and supplier in Mumbai, Gandhidham, Visakhapatnam, Chennai, Ennore, Kolkata Haldia, Fujairah, Dubai, Sharjah, Abudhabi. RXSOL Brand Distilled Water Battery Grade largest manufacturer and supplier in Muscat Ghala, Barka Ruwi Oman, Nairobi Kenya Sudan Yemen |